Dam-Based Hydropower Calculator

Dam-Based Hydropower Calculator picks turbine, power, and energy with losses from head, flow, efficiencies, penstock, and storage for dam energy planning.

Formulas Used in Dam-Based Hydropower Calculator

The calculator uses the following formulas and logic to select a turbine and estimate power and energy:

Flow Velocity:

\\[ v = \frac{Q}{\pi (D/2)^2} \\]

Head Loss:

\\[ h_{\text{loss}} = \left( f \cdot \frac{L}{D} \cdot \frac{v^2}{2g} \right) + \left( K \cdot \frac{v^2}{2g} \right) \\]

Net Head:

\\[ h_{\text{net}} = h_{\text{gross}} – h_{\text{loss}} \\]

Power Output:

\\[ P = \eta_{\text{turbine}} \cdot \eta_{\text{generator}} \cdot \rho \cdot g \cdot h_{\text{net}} \cdot Q \\]

Power in Kilowatts:

\\[ P_{\text{kW}} = \frac{P}{1000} \\]

Energy Output:

\\[ E = P \cdot t \cdot \frac{V_{\text{storage}}}{Q \cdot t_{\text{max}}}, \quad t_{\text{max}} = \frac{V_{\text{storage}}{Q} \\]

Turbine Selection:

  • Kaplan: Head 2–20 m, Flow > 1 m³/s
  • Francis: Head 10–100 m, Flow 0.5–50 m³/s
  • Pelton: Head > 100 m, Flow 0.01–10 m³/s
  • Crossflow: Head 2–40 m, Flow < 1 m³/s

Where:

  • \\( v \\): Flow velocity (m/s)
  • \\( Q \\): Flow rate (m³/s)
  • \\( D \\): Penstock diameter (m)
  • \\( h_{\text{loss}} \\): Head loss (m)
  • \\( f \\): Friction factor
  • \\( L \\): Penstock length (m)
  • \\( K \\): Minor loss coefficient
  • \\( g \\): Gravitational acceleration (9.81 m/s²)
  • \\( h_{\text{net}} \\): Net head (m)
  • \\( h_{\text{gross}} \\): Gross head (m)
  • \\( P \\): Power output (W)
  • \\( \eta_{\text{turbine}} \\): Turbine efficiency
  • \\( \eta_{\text{generator}} \\): Generator efficiency
  • \\( \rho \\): Water density (kg/m³)
  • \\( E \\): Energy output (kWh)
  • \\( t \\): Operating time (hours)
  • \\( V_{\text{storage}} \\): Reservoir storage volume (m³)
  • \\( t_{\text{max}} \\): Maximum depletion time (s)

Example Calculations

Example 1: Medium Dam

Input: Head = 50 m, Flow = 10 m³/s, Turbine Eff. = 0.85, Generator Eff. = 0.90, Density = 1000 kg/m³, Penstock Length = 500 m, Diameter = 2 m, Friction = 0.02, Minor Loss = 0.5, Storage = 1,000,000 m³, Time = 24 h

\\[ v = \frac{10}{\pi (2/2)^2} \approx 3.18 \ \text{m/s} \\] \\[ h_{\text{loss}} = \left( 0.02 \cdot \frac{500}{2} \cdot \frac{3.18^2}{2 \cdot 9.81} \right) + \left( 0.5 \cdot \frac{3.18^2}{2 \cdot 9.81} \right) \approx 3.09 \ \text{m} \\] \\[ h_{\text{net}} = 50 – 3.09 = 46.91 \ \text{m} \\] \\[ P = 0.85 \cdot 0.90 \cdot 1000 \cdot 9.81 \cdot 46.91 \cdot 10 \approx 3520750.5 \ \text{W} \\] \\[ P_{\text{kW}} = \frac{3520750.5}{1000} \approx 3520.75 \ \text{kW} \\] \\[ t_{\text{max}} = \frac{1000000}{10} = 100000 \ \text{s} \approx 27.78 \ \text{h} \\] \\[ E = 3520.75 \cdot 24 \cdot \frac{1000000}{10 \cdot 100000} \approx 84498.0 \ \text{kWh} \\]

Turbine: Francis (Head 10–100 m, Flow 0.5–50 m³/s)

Result: Turbine = Francis, Power = 3520.75 kW, Energy = 84498.0 kWh, Net Head = 46.91 m

Example 2: Small Dam

Input: Head = 10 m, Flow = 2 m³/s, Turbine Eff. = 0.80, Generator Eff. = 0.85, Density = 1000 kg/m³, Penstock Length = 200 m, Diameter = 1 m, Friction = 0.03, Minor Loss = 0.3, Storage = 200,000 m³, Time = 12 h

\\[ v = \frac{2}{\pi (1/2)^2} \approx 2.55 \ \text{m/s} \\] \\[ h_{\text{loss}} = \left( 0.03 \cdot \frac{200}{1} \cdot \frac{2.55^2}{2 \cdot 9.81} \right) + \left( 0.3 \cdot \frac{2.55^2}{2 \cdot 9.81} \right) \approx 2.29 \ \text{m} \\] \\[ h_{\text{net}} = 10 – 2.29 = 7.71 \ \text{m} \\] \\[ P = 0.80 \cdot 0.85 \cdot 1000 \cdot 9.81 \cdot 7.71 \cdot 2 \approx 102915.2 \ \text{W} \\] \\[ P_{\text{kW}} = \frac{102915.2}{1000} \approx 102.92 \ \text{kW} \\] \\[ t_{\text{max}} = \frac{200000}{2} = 100000 \ \text{s} \approx 27.78 \ \text{h} \\] \\[ E = 102.92 \cdot 12 \cdot \frac{200000}{2 \cdot 100000} \approx 1235.0 \ \text{kWh} \\]

Turbine: Kaplan (Head 2–20 m, Flow > 1 m³/s)

Result: Turbine = Kaplan, Power = 102.92 kW, Energy = 1235.0 kWh, Net Head = 7.71 m

Example 3: High-Head Dam

Input: Head = 150 m, Flow = 5 m³/s, Turbine Eff. = 0.90, Generator Eff. = 0.95, Density = 1000 kg/m³, Penstock Length = 1000 m, Diameter = 1.5 m, Friction = 0.015, Minor Loss = 0.7, Storage = 5,000,000 m³, Time = 48 h

\\[ v = \frac{5}{\pi (1.5/2)^2} \approx 2.83 \ \text{m/s} \\] \\[ h_{\text{loss}} = \left( 0.015 \cdot \frac{1000}{1.5} \cdot \frac{2.83^2}{2 \cdot 9.81} \right) + \left( 0.7 \cdot \frac{2.83^2}{2 \cdot 9.81} \right) \approx 4.79 \ \text{m} \\] \\[ h_{\text{net}} = 150 – 4.79 = 145.21 \ \text{m} \\] \\[ P = 0.90 \cdot 0.95 \cdot 1000 \cdot 9.81 \cdot 145.21 \cdot 5 \approx 6091467.8 \ \text{W} \\] \\[ P_{\text{kW}} = \frac{6091467.8}{1000} \approx 6091.47 \ \text{kW} \\] \\[ t_{\text{max}} = \frac{5000000}{5} = 1000000 \ \text{s} \approx 277.78 \ \text{h} \\] \\[ E = 6091.47 \cdot 48 \cdot \frac{5000000}{5 \cdot 1000000} \approx 292390.6 \ \text{kWh} \\]

Turbine: Pelton (Head > 100 m, Flow 0.01–10 m³/s)

Result: Turbine = Pelton, Power = 6091.47 kW, Energy = 292390.6 kWh, Net Head = 145.21 m

Related To Run-of-River Hydropower Calculator

  1. Hydropower Water Usage Calculator
  2. Hydro Power Revenue Estimator
  3. Hydropower Head Loss Calculator
  4. Hydropower Turbine Efficiency Calculator
  5. Dam Height Optimization Calculator
  6. More Engineering Related Calculator